Simple and detailed instructions on how to make a floor in a bath with your own hands. This instruction for novice builders who want to know how to build a floor in a bathhouse with their own hands will help you save a lot of money and your own effort spent on construction procedures. Also, you can easily avoid unpleasant moments in the process of performing some type of work, for example, floor insulation in a bath..
The waterproofing of the floor in the bathhouse is a continuous layer of boards, where the drainage is built by means of the inclined surface of the intermediate overlap towards the outlet pipe, which transfers all excess liquid to the drainage tank (located somewhere in the underground area). Trapped water is discharged outside the barrel by gravity using an inclined type of pipe.
Photos of the floor in the bath
Somewhere under the top layer of the timber flooring for the bathhouse floor there is a warm lining, laid on the lower level of the logs made of second-class timber. Wadded or loose type thermal insulation material in a puff protects against moisture and steam corresponding building materials used in the decoration.
Ventilation of the floor in the bath room will be predominantly of a through type, since between its structural elements a certain size of holes of three or five millimeters are specially made for free drainage in the underground area sprayed with special washing devices. Due to the open type of building, the floor in the bath room will always remain cool, therefore this option for arranging the building is only suitable for the type of structure that is located in an area with relatively warm climatic conditions.
Examples of laying the floor in the bath
For a certain number of regions of our homeland, with more merciless weather conditions, such a design of a bath room is almost completely unsuitable for use, due to the impossibility of using an insulation material for the floor covering and sufficient protection of the legs of bathers from the chill flowing with the air from the underground.
The final touch in the manufacture of the floor will be the installation of a finishing coating of tongue-and-groove finishing material. It is better to lay them in such a way that the corresponding mounting groove is constantly located at the bottom of the structural elements. All together will help to protect the coating from annoying damage to the castle during the installation of the boardwalk..
Typical floor construction requires mandatory ventilation of the inner layers. To fulfill this condition, a tube is lowered into the space between the newly built and the rough floor covering, the end of which is brought out to the top cover.
The device of a rough floor with insulation in a bath — video